This project built a 44 hectare residue storage area and a 23 hectare runoff collection pond.

Charles Hull Contracting (CHC) were engaged to complete this project by Alcoa of Australia at their residue storage area located in Wagerup, WA. The project which started in 2011 and was completed in 2014 introduced a 44 hectare residue storage area and a 23 hectare runoff collection pond to successfully contain residue whilst continuing to produce alumina at their Wagerup refinery.

Key activities:

  • 2.2 million m3 of fill
  • 8 km of bitumen sealed roadways
  • 20 km of high pressure HDPE pipe
  • 1 million m2 of HDPE liner
  • 36 km of underdrainage piping

More To Explore

Projects

TSF Wall Lift

Client: ALCOA Project: TSF Wall Lift Location: Pinjarra, WA Summary: Raising wall of tailings storage facility with installation of underdrainage. Effective trimming using GPS Reduction

Projects

Haul Road Construction

Client: ALCOA Project: Haul Road Construction Location: Huntly and Willowdale, WA Summary: The project involved the construction of 1200km of haul roads for a long

Charles Hull Contracting Co Pty Ltd

Built a leading reputation in completing major projects including clearing, haul road construction, topsoil and overburden removal, TSF construction and minesite rehabilitation.

GREAT SOUTHERN | GOLDFIELDS | SOUTH WEST | GASCOYNE | PILBARA | KIMBERLEY | MIDWEST | WHEATBELT | PEEL | INTERSTATE