


Client:
ALCOA
Project:
Haul Road Construction
Location:
Huntly and Willowdale, WA
Summary:
The project involved the construction of 1200km of haul roads for a long term client.
- CHC maintained a good understanding of the job scope.
- Strong resource management to maintain targets set by the client.
- A good working relationship was held between CHC and the client.
- Haul roads programme was always delivered on time and on budget.
Key activities:
- Topsoil removal
- Secondary overburden removal
- SOBR Backfill
- Drill and blast
- Dozer levelling
- Load and haul
- Subgrade trim
- Gravel placement
- Bund and sump trimming
- Culverts and drainage installation