Summary:

The project involved the construction of 4 Grain Pads and the access road.

The initial contract was to build 1 grain bulkhead, this turned into constructing 4 bulkheads. CHC were able to accommodate this request with strong resource management and a determination to complete the works for CBH.

CHC maintained a good understanding of the job scope with strong project management to maintain a strict deadline date set by the client.

The job was completed two weeks ahead of the scheduled finish date.

A good working relationship was obtained between CHC and the client.

Key activities:

  • Topsoil Removal
  • Cut to fill earthworks
  • Gravel placement
  • Cement stabilisation
  • Bitumen seal
  • Asphalt
  • Culvert installation
  • Drainage works
  • Trimming works
  • Erection of bulkhead frames

Download PDF here.

More To Explore

Projects

TSF Wall Lift

Client: ALCOA Project: TSF Wall Lift Location: Pinjarra, WA Summary: Raising wall of tailings storage facility with installation of underdrainage. Effective trimming using GPS Reduction

Projects

Haul Road Construction

Client: ALCOA Project: Haul Road Construction Location: Huntly and Willowdale, WA Summary: The project involved the construction of 1200km of haul roads for a long

Charles Hull Contracting Co Pty Ltd

Built a leading reputation in completing major projects including clearing, haul road construction, topsoil and overburden removal, TSF construction and minesite rehabilitation.

GREAT SOUTHERN | GOLDFIELDS | SOUTH WEST | GASCOYNE | PILBARA | KIMBERLEY | MIDWEST | WHEATBELT | PEEL | INTERSTATE